The visible work is reasonably well defined, but the condition behind the finishes is not. I have a preliminary allowance of €287,400 for a 95 m², five-bedroom serviced apartment in Rome, covering the kitchen, bathrooms, floors, decoration, electrical assessment and some energy-efficiency work. There is no planned extension.
My main concerns are concealed plumbing, damp and any structural work revealed after opening up, rather than the choice of finishes. If targeted inspections show that the services and wet areas are sound, I could keep a smaller reserve and defer cosmetic items. If access or moisture problems appear, I would want a much larger contingency before appointing the contractor. What should be inspected now, and which exclusions should every bidder be required to price?
My main concerns are concealed plumbing, damp and any structural work revealed after opening up, rather than the choice of finishes. If targeted inspections show that the services and wet areas are sound, I could keep a smaller reserve and defer cosmetic items. If access or moisture problems appear, I would want a much larger contingency before appointing the contractor. What should be inspected now, and which exclusions should every bidder be required to price?