I keep going back and forth between carrying a large contingency now and asking contractors to narrow every uncertain item before setting one. The working budget is S$319,500 for renovating a 50 m² mixed-use building in Singapore.
The planned work covers the kitchen, bathrooms, floors, painting, electrical checks and moderate improvements to energy use. There is no proposed structural extension. Finishes are fairly easy to specify; opening walls or floors, gaining access to plumbing and coordinating the order of work are less predictable.
What would you require in the survey and contractor quotations before reducing the contingency? I’m particularly interested in separately priced exclusions, responsibility for making good after access work, signs of moisture, the boundary of the electrical work, approval timing and long-lead items.
The planned work covers the kitchen, bathrooms, floors, painting, electrical checks and moderate improvements to energy use. There is no proposed structural extension. Finishes are fairly easy to specify; opening walls or floors, gaining access to plumbing and coordinating the order of work are less predictable.
What would you require in the survey and contractor quotations before reducing the contingency? I’m particularly interested in separately priced exclusions, responsibility for making good after access work, signs of moisture, the boundary of the electrical work, approval timing and long-lead items.