The finishes are not what worry me; it is what might be uncovered once this 45 m² Osaka townhouse is opened up. I have a working budget of ¥59,640,000 for renewing the kitchen and bathrooms, replacing floor finishes, redecorating, checking the electrics and improving energy performance. There is no added floor area in the plan.
At this early stage, how much would you keep outside the quoted work for surprises? I would also like to know which inspections best expose structural or moisture problems, and how contractors should state assumptions about demolition, access and remedial work. Material lead times matter too because one delayed item could disrupt the sequence in such a small space. I am happy to reduce the specification if that protects the cash reserve.
At this early stage, how much would you keep outside the quoted work for surprises? I would also like to know which inspections best expose structural or moisture problems, and how contractors should state assumptions about demolition, access and remedial work. Material lead times matter too because one delayed item could disrupt the sequence in such a small space. I am happy to reduce the specification if that protects the cash reserve.