The proposed scope is being treated as non-structural, and that is the part I hesitate to rely on in an older Berlin townhouse. I’m testing a €72,040 budget for 170 m², covering the kitchen, bathrooms, floors, decorating, electrical review and some energy-efficiency work. There is no extension in the plan.
Once walls or floors are opened, moisture, wiring or structural defects could upset both cost and sequence. How much would you hold outside the main budget, and what should a surveyor or contractor investigate before pricing? I also want to identify exclusions and material lead times rather than spend time choosing finishes too early.
Once walls or floors are opened, moisture, wiring or structural defects could upset both cost and sequence. How much would you hold outside the main budget, and what should a surveyor or contractor investigate before pricing? I also want to identify exclusions and material lead times rather than spend time choosing finishes too early.