The two quotes cannot really be compared yet. My specific concern is that each contractor has interpreted the hidden work differently.
The project is a 105 m² warehouse in Seoul with a preliminary budget of ₩284,800,000. The intended work covers new kitchen and bathroom areas, finishes, electrical review and some energy improvements, without adding an extension. Before setting the contingency, I plan to put both bidders against one room-by-room scope showing inclusions, exclusions and sequencing.
What investigations should accompany that document? I’m particularly concerned about access to drains, damp in the roof or walls, and work that could become structural even though the footprint is unchanged. A concrete example would be whether a new ventilation opening needs support that neither quote currently includes.
The project is a 105 m² warehouse in Seoul with a preliminary budget of ₩284,800,000. The intended work covers new kitchen and bathroom areas, finishes, electrical review and some energy improvements, without adding an extension. Before setting the contingency, I plan to put both bidders against one room-by-room scope showing inclusions, exclusions and sequencing.
What investigations should accompany that document? I’m particularly concerned about access to drains, damp in the roof or walls, and work that could become structural even though the footprint is unchanged. A concrete example would be whether a new ventilation opening needs support that neither quote currently includes.