AED 469,600 looks workable as a starting figure, but concealed moisture is the concern that could overturn it. The property is an older 175 m² coastal home, and the intended renovation includes the main interiors, wet areas, service checks and some energy improvements rather than an extension.
Before treating the budget as fixed, I want to understand the likely structural repairs, access needed for pipes and wiring, and the order in which walls, floors and bathrooms should be opened. Material lead times could also leave completed work exposed or force substitutions. If inspections can establish that the structure and concealed services are sound, would a normal percentage reserve be enough? If they cannot, would you price separate allowances for moisture, electrical and access work instead? What exclusions should every contractor be required to identify?
Before treating the budget as fixed, I want to understand the likely structural repairs, access needed for pipes and wiring, and the order in which walls, floors and bathrooms should be opened. Material lead times could also leave completed work exposed or force substitutions. If inspections can establish that the structure and concealed services are sound, would a normal percentage reserve be enough? If they cannot, would you price separate allowances for moisture, electrical and access work instead? What exclusions should every contractor be required to identify?