One named person — the lead on that unit — and it has to be in writing, not a nod in the hallway. In our turns the lead walks the room with a short list for the next trade: what is dry and ready, what is still wet or curing, what is blocked, and a photo of each. The next trade then confirms before they travel, and if something is not ready they say so the same day, not when they arrive. That one step has saved us more wasted trips than any schedule. Whoever is paying for the wasted trip is usually the one who ends up owning the sign-off.