The 112-day schedule is the constraint I am least sure about, particularly if hidden moisture, plumbing access or electrical work interrupts the sequence. The project is a 175 m² Delhi apartment with a preliminary budget of ₹8,359,000 and no planned extension.
The work covers a new kitchen and bathrooms, replacement finishes, decorating, electrical investigation and some energy improvements. Before approval, I want to separate optional finishes from items that could stop later trades. Which surveys should happen first, and what should the contractor confirm in writing about waterproofing, pipe access, unsafe wiring, material lead times, making good and exclusions? I am also trying to set a contingency based on those findings rather than choosing an arbitrary percentage.
The work covers a new kitchen and bathrooms, replacement finishes, decorating, electrical investigation and some energy improvements. Before approval, I want to separate optional finishes from items that could stop later trades. Which surveys should happen first, and what should the contractor confirm in writing about waterproofing, pipe access, unsafe wiring, material lead times, making good and exclusions? I am also trying to set a contingency based on those findings rather than choosing an arbitrary percentage.