I have two contractors pricing the same renovation scope very differently and am trying to test whether a preliminary budget of ₩204,400,000 is realistic for a 40 m² mixed-use building in Seoul.
The planned work covers the kitchen, bathrooms, flooring, paint, electrical checks and moderate energy upgrades. There is no structural extension, and I care more about sequencing and hidden conditions than finish selection.
Before comparing the bids line by line, what contingency would you carry? I would also appreciate specific questions to put to the contractors about exclusions, plumbing access, electrical scope, moisture risk, material lead times and permit timing. Which survey or inspection would do the most to clarify those unknowns before signing?
The planned work covers the kitchen, bathrooms, flooring, paint, electrical checks and moderate energy upgrades. There is no structural extension, and I care more about sequencing and hidden conditions than finish selection.
Before comparing the bids line by line, what contingency would you carry? I would also appreciate specific questions to put to the contractors about exclusions, plumbing access, electrical scope, moisture risk, material lead times and permit timing. Which survey or inspection would do the most to clarify those unknowns before signing?