Renovation budget for a 180 m² coastal home in Dubai

green_garden

Property investor
I want to keep the renovation near AED 226,800. The obstacle is that the least visible items could decide whether that budget is realistic.

The home is 180 m², and the intended work covers the kitchen, bathrooms, floors, painting, electrical inspection and some energy improvements rather than an extension. Finishes can be changed or scaled back later; concealed moisture, inaccessible plumbing and permit delays cannot be managed so easily once work starts. I’m thinking the sensible order is survey wet areas and service routes, define what the electrical allowance actually covers, confirm permit timing, and only then price the cosmetic work. How large a reserve would you retain until those checks and contractor exclusions are clear?
 
I would initially allow around 20% until the wet areas, distribution board, accessible wiring and plumbing routes have been inspected. Ask each contractor to list exclusions beside the price—not buried in general terms—and identify anything priced as an allowance. Also request a programme showing permit assumptions and dates for ordering long-lead materials. If investigations remove major unknowns, you can reduce the contingency before signing.
 
Twenty percent may still be misleading if “electrical checks” has not been defined. Does the figure cover testing only, minor corrections, or replacement work if problems appear? I’d also want to know whether the home will be occupied during renovation, because that changes sequencing and temporary protection. For the coastal aspect, has anyone inspected behind bathroom fittings, skirting and kitchen units for moisture rather than relying on visible surfaces?
 
One further point: I would not simply add a blanket percentage and treat the budget as safe. First split AED 226,800 into confirmed work, provisional allowances and genuinely unknown conditions. Open up a few agreed inspection areas before final pricing, then have plumbing, electrical and moisture findings written into the scope. Ask who carries the cost of access, making good, debris removal, permit delays and material substitutions. That should show whether 20% is cautious or inadequate.
 