I need to decide soon enough to keep the renovation aligned with the school timetable, but rushing the contractor choice could create a longer delay later. The working budget is CHF 335,200 for a 160 m² duplex in Zurich.
The planned work covers the kitchen, bathrooms, floors, decoration, an electrical review and some energy improvements. There is no intended extension. Two contractors have nevertheless returned very different totals for what should be comparable work.
Before selecting one, I want to separate items that can wait from risks that could stop the programme entirely. Which inspections would you arrange for moisture, accessible plumbing and the electrical installation, and how would you test material lead times and trade sequencing? I would also welcome views on setting a contingency once both quotations have been normalised.
The planned work covers the kitchen, bathrooms, floors, decoration, an electrical review and some energy improvements. There is no intended extension. Two contractors have nevertheless returned very different totals for what should be comparable work.
Before selecting one, I want to separate items that can wait from risks that could stop the programme entirely. Which inspections would you arrange for moisture, accessible plumbing and the electrical installation, and how would you test material lead times and trade sequencing? I would also welcome views on setting a contingency once both quotations have been normalised.