Before I ask contractors to turn this into firm quotes, I need to decide whether A$115,600 is the working budget or the absolute ceiling. The project is a 155 m² older Sydney villa, covering the kitchen, bathrooms, floors, painting, electrical assessment and some energy improvements. I am not planning an extension or other deliberate structural work.
Reducing the visible scope would be easier to reverse than discovering late plumbing, waterproofing or moisture damage after the walls are opened. What contingency would you keep outside the quoted work, and which targeted inspections would be worth arranging first? I would also ask contractors to state their assumptions about access, sequencing, wall repairs and anything excluded from the price.
Reducing the visible scope would be easier to reverse than discovering late plumbing, waterproofing or moisture damage after the walls are opened. What contingency would you keep outside the quoted work, and which targeted inspections would be worth arranging first? I would also ask contractors to state their assumptions about access, sequencing, wall repairs and anything excluded from the price.