Renovation budget for a 120 m² new-build flat in Warsaw

rue.archer

Homeowner
Established
I need to settle the budget before contractor pricing is agreed. Moving quickly could protect the programme, but fixing the figure too early may leave the uncertain work badly underfunded.

The flat is a 120 m² new build in Warsaw, with a preliminary renovation allowance of PLN 2,049,000. The intended work includes the kitchen, two wet areas, floors, decoration, an electrical review and limited energy improvements; there is no extension. I am less worried about the visible finish choices than about extra electrical work, concealed plumbing access, moisture findings and exclusions that only become apparent once different trades begin.

Would you hold contingency across the full budget, or attach larger allowances only to packages with unresolved scope? Before signing, I want the surveyor and bidders to identify assumptions, access limitations, testing still required, excluded making-good work and dependencies between trades. I also need a realistic order for procurement, any approvals, and materials with long lead times so a permit or delivery delay does not disrupt the whole schedule.
 
Back
Top