If I choose the wrong bid, the R$2,673,000 budget could still fail despite looking generous for a 120 m² detached home in Rio de Janeiro. The planned renovation includes the kitchen, bathrooms, floors, painting, electrical review and some energy improvements, but not an extension. Two contractors have returned markedly different prices.
I am less worried about finishes than concealed moisture, inaccessible plumbing, unclear electrical repairs and delays in approvals or materials. Should I commission targeted investigation before selecting a contractor, or choose only after both have itemised exclusions and lead times? My decision rule is becoming: investigate where access is limited, but otherwise require a fixed scope with a separate reserve and written pricing before any discovered work proceeds. What contingency would be sensible after that?
I am less worried about finishes than concealed moisture, inaccessible plumbing, unclear electrical repairs and delays in approvals or materials. Should I commission targeted investigation before selecting a contractor, or choose only after both have itemised exclusions and lead times? My decision rule is becoming: investigate where access is limited, but otherwise require a fixed scope with a separate reserve and written pricing before any discovered work proceeds. What contingency would be sensible after that?