Before contractor quotes are compared, I need to decide whether CHF 71,360 is a credible starting budget or merely a hopeful ceiling. The project is a 230 m² student housing property in Zurich, with work planned to the kitchen, bathrooms, floors and painted surfaces, plus electrical assessment and limited energy improvements. There is no intended extension.
The finishes are not the main uncertainty. Plumbing access, moisture and defects uncovered during electrical checks could disrupt both cost and sequencing, while contractor exclusions, material lead times or permit timing may not become obvious until later.
At this early stage, how would you set the contingency? I would also appreciate a practical list of surveys and questions that would expose those risks before the bids are placed side by side.
The finishes are not the main uncertainty. Plumbing access, moisture and defects uncovered during electrical checks could disrupt both cost and sequencing, while contractor exclusions, material lead times or permit timing may not become obvious until later.
At this early stage, how would you set the contingency? I would also appreciate a practical list of surveys and questions that would expose those risks before the bids are placed side by side.