Renovation budget for 130 m² student housing in Kuala Lumpur—what contingency?

knitsAndPlan

Property investor
Established
If the hidden work is underestimated, a MYR 372,400 budget could stop being useful as soon as walls or floors are opened. It is an early estimate for renovating 130 m² of student housing in Kuala Lumpur, including kitchen and bathroom work, new floor finishes, decorating, electrical review and moderate energy improvements. There is no planned extension.

The building is older, so access and sequencing worry me more than the choice of finishes. Concealed wiring, hard-to-reach plumbing, moisture damage or an unexpected structural issue could alter both cost and programme. Quotation exclusions, permit timing and material lead times add another layer.

At this stage, what contingency would be sensible, and should hidden defects sit in a separate allowance rather than the general reserve? I would also like a short list of questions for the surveyor and contractors, particularly on plumbing access, the extent of electrical work, signs of moisture, possible structural intervention and everything omitted from the price.
 
Back
Top