freya_checks
Property investor
The scope is now limited to renovating the existing 100 m² Lisbon student housing property, which raises a new question about how much of the €173,300 budget should remain uncommitted. The work includes kitchens and bathrooms, new finishes, electrical checks and moderate energy improvements, but no extension.
My assumption was that a non-structural project would be reasonably predictable. An older wall concealing damp or wiring that needs full replacement would quickly disprove that, particularly if plumbing access is poor. Permit timing and material lead times could also change the order of work.
Before tender, which inspections would best reduce those unknowns? I also want every contractor to state what is excluded, who makes good after opening walls, and whether electrical, moisture and plumbing work is priced as a fixed scope or an allowance. For example, a low bathroom quote is not comparable if pipe access and wall repairs sit outside it. What contingency would be sensible before those points are resolved?
My assumption was that a non-structural project would be reasonably predictable. An older wall concealing damp or wiring that needs full replacement would quickly disprove that, particularly if plumbing access is poor. Permit timing and material lead times could also change the order of work.
Before tender, which inspections would best reduce those unknowns? I also want every contractor to state what is excluded, who makes good after opening walls, and whether electrical, moisture and plumbing work is priced as a fixed scope or an allowance. For example, a low bathroom quote is not comparable if pipe access and wall repairs sit outside it. What contingency would be sensible before those points are resolved?