Renovation budget and contingency for a 220 m² Dubai apartment

daily_porch

Property investor
Established
AED 662,200 may be workable for a 220 m² apartment, but concealed water damage is the part that worries me. The planned work includes kitchens and bathrooms, new floor and paint finishes, electrical inspection and some energy improvements; there is no extension.

Cosmetic items can be delayed, whereas unsafe wiring or leaking pipework cannot. Before choosing a reserve, what should the survey and bids say about access to plumbing, waterproofing, moisture, working sequence and contractor omissions? I also want to understand which approvals are assumed and whether restricted access or long material lead times could disrupt the programme.
 
Before choosing a contingency percentage, ask contractors to separate visible scope from provisional work. Specifically: what happens if bathroom waterproofing has failed, concealed pipework needs replacement, the electrical checks reveal remedial work, or building access limits working hours and debris removal? Also ask which permits, approvals and material lead times are assumed. A general contingency cannot compensate for a quotation full of exclusions.
 
I agree on exclusions, but I wouldn’t assume “no extension” means no structural concern. Moving kitchen or bathroom services, chasing floors or walls, and altering openings may still need closer scrutiny and building approval. First clarify the apartment’s age, whether wet areas are staying in place, and whether there are any moisture stains or previous leaks. Then price essential electrical, plumbing and waterproofing work separately from finishes, and keep the cosmetic items as the first package to defer.
 
Back
Top