The first pass at the scope now totals £89,950, which raises a more useful question than choosing finishes: how much of that figure is genuinely supported by inspection and contractor detail? The property is a 1,830 sq ft small multifamily in Manchester. The plan includes kitchens, bathrooms, flooring, decoration, electrical checks and some energy improvements, but no extension.

Before treating the number as a budget, I want the surveyor and contractors to examine moisture sources, plumbing access, the likely electrical work and any signs that structural repairs could be needed. I also need clarity on exclusions, approval delays, sequencing and long-lead materials.

Would you keep the contingency outside the £89,950 so it cannot be absorbed into upgrades? If the investigations rule out major hidden work, I could reduce it later; if access remains limited or quotes contain broad exclusions, I would retain a larger reserve.
 