One crew for the whole turn vs. a sub for every trade

Juggling four subs for one apartment means three schedules that can slip. One painter waiting on a cabinet installer, a floor layer waiting on the painter, a tiler waiting on everyone — and the turn stretches a week while the unit sits empty.

A single crew that paints, hangs cabinets, lays floor, and tiles keeps the turn on one clock. One schedule, one person accountable for the sequence, and the small gaps between trades disappear because the same hands are doing the next step.

But not every job allows it. Some work needs a license, some needs a specialist's tools, and some is simply too big for one crew to do well.

Where do you still bring in a specialist sub, no matter what — and what is the line for you between 'our crew can do this' and 'call the specialist'?
 
I'd draw the line using competence, local licensing requirements and who can verify the finished work, rather than whether somebody on the crew owns the right-looking tool. One coordinator can still manage a job that needs specialist trades.

A useful scope table would list each task, who performs it, any required specialist or inspection, and who accepts the handover. That keeps the single point of contact you describe without asking one crew to be expert at everything. Even a very good multitool isn't a whole toolbox.
 
Back
Top