Offering 3% below asking on a Rio mixed-use building after 103 days

yuki_north

Property investor
Established
The building has reached 103 days on the market, which makes me wonder whether the seller would seriously consider a modest reduction. The asking price is R$6,188,000, and the mixed residential and commercial use makes the limited completed-sale evidence difficult to interpret.

I am thinking of starting 3% lower. I can show credible financing and be accommodating about completion, so the offer would not depend on price alone. The difficult part is deciding which unknowns could materially change the deal, particularly occupancy, income, building condition and appraisal.

Would you keep full inspection and financing protections, then deal with necessary work through a focused repair credit rather than presenting every minor defect? I want a straightforward offer, but not one that leaves me carrying expensive risks I cannot yet measure.
 
Three percent below is R$6,002,360, so this is not an extreme opening. I would keep the rationale short: time on market, updating required, limited evidence from completed comparables, plus your financing proof and flexibility.

Retain inspection, financing and appraisal protections. Set a clear but reasonable response deadline, and avoid implying that 103 days proves the seller is desperate.
 
Before settling on contingencies, is the building occupied, and does the price depend partly on rental income? With mixed-use property, existing occupancy arrangements and the condition of the commercial areas could matter more than cosmetic updating.

I would also clarify what “clean financing” means here. A strong approval or proof of funds can reassure the seller without requiring you to absorb an unlimited appraisal gap.
 
Those are important questions, although I would not turn all of them into arguments for the initial discount. The offer can stay simple while the contract preserves room to investigate them.

For repairs, ask for a credit or renegotiation only if inspection reveals a material, expensive issue—structure, roof or major building systems—not every item that is merely dated. The buyer should also retain a clear exit if the findings or appraisal make the deal unworkable.
 
I’m less convinced that 3% is automatically modest. Similar asking prices only show what other sellers hope to receive; without completed comparables, the building might already be keenly priced or substantially high.

The bigger concern is deposit exposure. Financing proof is useful, but it is not a substitute for precise financing, appraisal and inspection wording. Have someone familiar with the applicable Rio transaction process confirm when the deposit can be retained or returned and what happens if valuation comes in below the agreed price.
 
I’d first ask the seller’s representative whether timing, certainty or price matters most. That may tell you whether the flexible completion date has real value.

Then submit R$6,002,360 with financing evidence, a defined response period and only material contingencies: satisfactory inspection of costly components, acceptable appraisal/financing, and satisfactory examination of the building’s legal and occupancy position. If defects emerge, request one consolidated repair credit rather than reopening negotiations over minor items. That presents the 3% as a supported business proposal, not a criticism of the property.
 
Back
Top