Numbers check: renovation budget for a 1,990 sq ft mixed-use building in Miami / sold-price history

porch.direct

Property investor
Established
The budget ceiling is the practical constraint, so I need to reduce uncertainty before choosing finishes. I have allowed $291,300 for renovating a 1,990 sq ft mixed-use building in Miami, without adding an extension.

The current plan includes kitchen and bathroom work, new floors, painting, electrical assessment and modest energy improvements. What concerns me is the scope that may emerge later: moisture behind finishes, inaccessible plumbing, structural discoveries during demolition or an electrical inspection that turns a limited repair into a larger replacement.

Before fixing the programme, I want contractors to identify exclusions, permit dependencies and materials with long lead times. What contingency would you retain, and which surveys or pre-contract questions would best narrow the risk? I am willing to simplify finishes now if that protects the essential work and keeps cash available through completion.
 
Back
Top