If remedial electrical work or inaccessible plumbing is discovered after the finishes are ordered, the £397,200 budget could be undermined by both rework and delay. This is a preliminary allowance for renovating a 1,510 sq ft Manchester villa, covering the kitchen, bathrooms, floors, decoration, electrical investigation and moderate energy improvements, without an extension.
Before debating finishes, I want to test the assumptions behind the scope. Which surveys would best identify moisture, services and other concealed problems, and how should tenderers distinguish inspections from actual repairs? I would also like to know what exclusions, provisional sums and material lead times should be pinned down before setting the contingency.
Before debating finishes, I want to test the assumptions behind the scope. Which surveys would best identify moisture, services and other concealed problems, and how should tenderers distinguish inspections from actual repairs? I would also like to know what exclusions, provisional sums and material lead times should be pinned down before setting the contingency.