How far below R$5,544,000 should I open on this São Paulo duplex?

DeepWall

First-time buyer
Established
I can either open 10% below the asking price now or wait for stronger completed-sale evidence, and neither approach is entirely comfortable. The São Paulo duplex is listed at R$5,544,000, has been on the market for 56 days and appears to require updating. Similar advertised properties provide some context, but they do not show the prices accepted by sellers.

My proposed offer would include financing evidence and flexibility over completion. I would explain it through the uncertain comparables and identifiable work rather than criticising every dated finish. The school catchment also matters to me, although I will confirm that independently.

Would you seek repair credits in the initial offer or wait until an inspection identifies necessary work? I also intend to retain inspection, financing or appraisal, and clear deposit conditions. Suggestions on a reasonable response deadline would be useful.
 
Ten percent below is R$4,989,600, which is a serious offer rather than a token bid. I’d present it briefly: limited completed-sale evidence, updating required, financing evidence attached, and flexibility on timing. Don’t tell the seller the property is overpriced unless you can prove it. Keep inspection and financing protection, and make the offer subject to satisfactory property and document checks.
 
How extensive is “updating”? Old finishes support a lower price emotionally, but necessary electrical, plumbing or structural work supports it financially. That distinction matters.

I’d also ask the agent what the seller values besides price. After 56 days they might want certainty, or they might be in no hurry at all. Time on market alone doesn’t reveal motivation.
 
The lack of completed-sale evidence is the detail that makes the 10% figure less convincing to me. Opening there is tempting because the duplex needs work, but similar asking prices neither prove that level nor show that sellers are accepting less.

I would set a firm maximum before submitting anything and link later movement to new information, such as a documented repair cost or appraisal result. Otherwise a low first offer can turn into several unsupported increases. Price can still be negotiated; giving up the financial limit or essential protections is much harder to undo.
 
Also, give the offer a clear but workable response deadline. Too short can look tactical; open-ended lets it sit while the seller looks for another buyer. The exact period should fit local practice and be agreed with whoever prepares the offer.
 
On the school point, verify the address directly with the relevant school or authority before assigning extra value to the catchment. Boundaries, eligibility and availability should not be assumed from marketing language. If that location is essential, confirmation belongs high on your pre-offer list rather than being used as leverage against the seller.
 
I wouldn’t ask for a repair credit before an inspection unless there is already a specific, priced defect. You risk counting the updating twice: once in the 10% discount and again as a general credit. Offer based on the visible condition, then reserve the right to address significant findings supported by the inspection.
 
The appraisal gap deserves separate thought. Financing proof shows that you are organised, but it does not guarantee the property will appraise at the agreed figure. Before signing, be clear about what happens if the lender values it lower and how much extra cash, if any, you would willingly contribute.
 
Same with the deposit: don’t focus only on its amount. The important issue is when it becomes exposed and under which agreed conditions it can be returned. Contract treatment can vary, so have the wording checked locally before paying or waiving anything. A flexible completion date is useful only if it doesn’t leave your money tied up indefinitely.
 
I agree on the deposit, but too many broad escape clauses can undermine the claim that this is a clean offer. Keep the protections tied to identifiable events—inspection findings, financing or appraisal outcome, and satisfactory documentation—with defined dates. That gives the seller more certainty than vague wording while still protecting the buyer.
 
One practical structure could be: price first, short explanation second, evidence of financing third, preferred inspection and financing timetable, then flexibility on completion. Avoid attaching an exhaustive renovation estimate unless the seller asks how you reached the number. The goal is to make R$4,989,600 understandable, not to win an argument about every dated finish.
 
Thanks all. I haven’t made the offer yet. I’m going to separate visible updating from anything that requires inspection, verify the school position independently, and set a firm maximum before negotiations begin. The opening will be R$4,989,600 with financing evidence and completion flexibility, but I won’t waive inspection, appraisal/financing protection or carefully defined deposit-return conditions.
 
That sounds balanced. One final suggestion: decide in advance how you’ll respond to a counteroffer—your next figure, your absolute ceiling, and whether you would trade price for completion timing rather than simply splitting the difference. If the seller rejects without countering, ask whether the problem is the amount or the terms before raising the offer.
 
Back
Top