I want the two Denver bids to be genuinely comparable, but their different assumptions make that difficult. The working budget is $314,800 for a 1,130 sq ft studio, covering the kitchen, bathrooms, floors, decoration, electrical investigation and some energy improvements. An extension is not intended.
Before choosing finishes, I need to separate easy-to-change allowances from risks that could force major work once surfaces are opened. What should each contractor disclose about exclusions, plumbing access, damp, structural findings, permits and long-lead materials? I would also be interested in how others set a contingency after those unknowns have been investigated.
Before choosing finishes, I need to separate easy-to-change allowances from risks that could force major work once surfaces are opened. What should each contractor disclose about exclusions, plumbing access, damp, structural findings, permits and long-lead materials? I would also be interested in how others set a contingency after those unknowns have been investigated.