I have priced the obvious rooms and finishes, but the work behind them is still unclear. The provisional figure is £131,600 for converting a 1,510 sq ft Edinburgh warehouse to a two-bedroom layout, with no extension intended.
Before setting the contingency, I need to know whether the existing structure can accept the layout, where water and drainage can run, and what the electrical allowance actually includes. Moisture and the consequences of opening floors or linings are further unknowns.
Which survey investigations would reduce those uncertainties most? I would also appreciate suggestions for questions that force contractors to identify access work, structural assumptions, making good and exclusions rather than leaving them buried in a general reserve.
Before setting the contingency, I need to know whether the existing structure can accept the layout, where water and drainage can run, and what the electrical allowance actually includes. Moisture and the consequences of opening floors or linings are further unknowns.
Which survey investigations would reduce those uncertainties most? I would also appreciate suggestions for questions that force contractors to identify access work, structural assumptions, making good and exclusions rather than leaving them buried in a general reserve.