£320,700 is enough money that I do not want a vague contingency masking an incomplete scope. I have spent 72 days comparing quotations for an 860 sq ft coastal home in London, covering internal refurbishment and moderate energy improvements without adding an extension.
The finishes can still be changed if prices run high; concealed moisture, unsafe wiring or inaccessible plumbing cannot be deferred so casually once work begins. I therefore want two allowances: one for work already suspected but not priced, and another for genuine discoveries.
What should the surveyor investigate before I set those amounts? I also need contractor questions that pin down electrical remedial work, making good after plumbing access, moisture treatment, material lead times, sequencing and responsibility for any permissions.
The finishes can still be changed if prices run high; concealed moisture, unsafe wiring or inaccessible plumbing cannot be deferred so casually once work begins. I therefore want two allowances: one for work already suspected but not priced, and another for genuine discoveries.
What should the surveyor investigate before I set those amounts? I also need contractor questions that pin down electrical remedial work, making good after plumbing access, moisture treatment, material lead times, sequencing and responsibility for any permissions.