Contingency for a £320,700 renovation of an 860 sq ft London coastal home

makeTheCanvas

Property investor
Established
£320,700 is enough money that I do not want a vague contingency masking an incomplete scope. I have spent 72 days comparing quotations for an 860 sq ft coastal home in London, covering internal refurbishment and moderate energy improvements without adding an extension.

The finishes can still be changed if prices run high; concealed moisture, unsafe wiring or inaccessible plumbing cannot be deferred so casually once work begins. I therefore want two allowances: one for work already suspected but not priced, and another for genuine discoveries.

What should the surveyor investigate before I set those amounts? I also need contractor questions that pin down electrical remedial work, making good after plumbing access, moisture treatment, material lead times, sequencing and responsibility for any permissions.
 
At that budget, I’d resolve the exclusions before settling on a contingency percentage. Ask whether “electrical checks” includes remedial work, how concealed plumbing will be accessed, and who pays for making good afterward. A moisture investigation also seems important for a coastal property. Even without an extension, confirm whether any proposed alterations affect structure. I’d keep separate allowances for identified-but-unpriced work and genuinely hidden conditions, while requiring each contractor to state lead times, sequencing assumptions and permit responsibility.
 