My preferred outcome is a finished, dependable home rather than an ambitious design, but too much of the preliminary budget still sits behind uncertain scope. The current figure is €453,500 for renovating a 65 m² country home in Berlin, including the kitchen, bathrooms, surfaces, electrical assessment and some energy improvements. I am not proposing an extension.
Before deciding on a contingency, I want to expose the expensive unknowns: plumbing access, moisture, the extent of electrical replacement and the order in which hidden work must happen. What should the surveyor investigate, and which contractor exclusions need explicit prices? I also need to identify materials with long lead times. If the hidden work remains uncertain, I would postpone finish selections; if it can be defined, I can simplify the visible design to keep the project within budget.
Before deciding on a contingency, I want to expose the expensive unknowns: plumbing access, moisture, the extent of electrical replacement and the order in which hidden work must happen. What should the surveyor investigate, and which contractor exclusions need explicit prices? I also need to identify materials with long lead times. If the hidden work remains uncertain, I would postpone finish selections; if it can be defined, I can simplify the visible design to keep the project within budget.