The figure that made me pause is ₩165,000,000 for only 40 m². This is an older small multifamily property in Seoul, so I am less worried about the visible finishes than about what appears once walls or floors are opened.
The intended renovation includes the kitchen and bathroom areas, new flooring and paint, electrical investigation and limited energy improvements. No extension is proposed, but that does not eliminate possible structural or shared-system issues. Before choosing a contractor, what should be checked about pipe routes, moisture, electrical capacity and access for service work? I also want bids to identify exclusions, uncertain items, reinstatement costs, material lead times and any approval delays. Would you hold a provisional reserve now and revise it after opening-up, rather than settle on one contingency percentage immediately?
The intended renovation includes the kitchen and bathroom areas, new flooring and paint, electrical investigation and limited energy improvements. No extension is proposed, but that does not eliminate possible structural or shared-system issues. Before choosing a contractor, what should be checked about pipe routes, moisture, electrical capacity and access for service work? I also want bids to identify exclusions, uncertain items, reinstatement costs, material lead times and any approval delays. Would you hold a provisional reserve now and revise it after opening-up, rather than settle on one contingency percentage immediately?