Bogotá purchase: is COP 131.2m enough to keep after closing?

field.full

Buyer
Established
I’m looking at a 4-bed serviced apartment in Bogotá for around COP 1,968,000,000, with closing expected in 72 days. After the deposit and estimated closing costs, I should have roughly COP 131,200,000 left.

How would you divide that between emergency savings, moving, immediate repairs and furniture? The inspection may uncover ordinary first-year work, and I’d rather buy below my maximum than turn every small problem into an emergency. Furniture can wait; essential building systems cannot.
 
I’d first ring-fence the first mortgage payment and a general emergency fund, then set aside known moving costs. The repair amount should follow the inspection rather than an arbitrary percentage, with only urgent items funded immediately. Furniture would be last.

Does the COP 131.2m already allow for the first service charge, insurance costs and the policy excess if you need to claim?
 
With a serviced apartment, I’d worry less about personally replacing a roof or boiler and more about what the service charges actually cover. A building-wide repair or an increase in charges could affect the buffer even if the apartment inspection looks clean. Ask about current charges, planned works and which systems are the owner’s responsibility before deciding how much is truly spare.
 
That’s an important distinction. I’d make four temporary pots now: untouchable emergency cash, purchase and moving overruns, the first mortgage/service-charge cycle, and inspection items. After the inspection and clarification of building responsibilities, any unused repair money can move to furniture. If those commitments leave the emergency pot looking thin, choosing a cheaper apartment is the safer adjustment.
 
Back
Top