Austin contingency for renovating an older 2,740 sq ft country home

EvaCove

Architect
Verified Pro
I have a preliminary $72,950 budget, but I still cannot tell how much of the older fabric will need attention once work starts. The property is a 2,740 sq ft country home in Austin, and the plan includes kitchen and bathroom work, new flooring, painting, electrical investigation and some energy improvements. There is no planned extension.

I’m not convinced that adding a standard contingency percentage is enough when hidden electrical, plumbing or moisture problems could alter the sequence entirely. Would it be better to fund surveys and limited opening-up first, then revise the budget before committing to the full renovation? I’d like contractors to identify exclusions, access assumptions and likely lead times, and I also need to understand which permits could affect the schedule. What inspections would best separate manageable unknowns from work that could undermine the $72,950 starting figure?
 