Repairs, credit or price reduction after inspection on Berlin new-build?

sailsAndWall

Homeowner
Established
I have the inspection findings and a total repair estimate of about €58,880. What remains unclear is how the lender would treat the available remedies and how much deposit risk I would carry if the response deadline passes without agreement.

This is a 185 m² new-build flat in Berlin at an agreed price of roughly €685,400. The seller is willing to commission the work, while I would prefer to select the contractors and oversee it. A completion credit therefore sounds more useful than a price reduction, provided it falls within the lender’s concession limits. On the other hand, a lower price might help if the valuation creates an appraisal gap.

What written confirmation should I request from the lender before responding? I would also be interested in what made seller-managed repairs acceptable to others—itemised scope, completion before closing, inspection rights or simply a sufficiently motivated seller.
 
If you need cash available for the work, a price reduction may be less useful than it first appears because it does not necessarily leave €58,880 in your account after completion. A credit could address that, but only if your lender accepts the structure and amount.

Is the €58,880 based on itemised estimates, and which defects must be fixed before occupation? I would not choose the remedy until those two points are clear.
 
I’d also compare the price with completed flats, not just current listings. If €685,400 was already above completed comparables, a reduction could help with a possible appraisal gap. If it was competitively priced, the seller may prefer repairs to a large concession.

How motivated is the seller, and are they offering finished work before completion or merely promising it afterward? Those are very different offers.
 
Aya’s distinction matters. I would not accept a vague promise to repair just because the deadline is close. Ask for the proposed scope, contractor details, completion timing and how unfinished or disputed items would be handled in the contract.

For the financing side, give the lender the inspection estimate and ask them to confirm in writing how a €58,880 credit, a price reduction, and seller-completed repairs would each be treated. Then compare the usable outcome rather than the headline concession.
 
I’m less opposed to seller-arranged work than the others. On a new-build flat, keeping completion responsibility with the seller may avoid you taking possession and immediately coordinating several trades. Your control over contractors has value, but so does not inheriting the scheduling and cost-overrun risk.

I’d consider seller repairs if they can be inspected before completion and the agreement preserves a clear remedy for incomplete work. Whether that can be arranged, and what happens to the deposit, depends on the actual contract.
 
There are really three separate decisions: who controls quality, who carries overruns, and how the concession interacts with financing. Put the options in a simple table using the same €58,880 estimate.

Before replying, get the lender’s answer, review the inspection protection and deposit terms with someone familiar with the Berlin transaction, and ask the seller whether they would accept a mixed solution—critical work completed before handover, with an agreed adjustment for the rest. That may fit both sides better than an all-or-nothing demand.
 