I’m considering a 250 m² townhouse in Seoul priced at ₩1,270,000,000 and testing a preliminary renovation budget of ₩466,200,000. The planned scope is a new kitchen and bathrooms, flooring, paint, electrical checks and moderate energy upgrades, with no extension intended.
Two contractors have priced what appears to be the same scope very differently, so I’m trying to identify whether the gap reflects genuine differences or exclusions. My bigger concerns are hidden structural work, electrical upgrades beyond basic checks, plumbing access, moisture damage, permit timing and long-lead materials—not finish selection.
For a property of this size, what contingency would you carry in Seoul? Also, which survey findings and contractor questions would most effectively reduce those unknowns before agreeing a contract? I’d particularly appreciate suggestions for comparing exclusions, sequencing assumptions and provisional allowances line by line.
Two contractors have priced what appears to be the same scope very differently, so I’m trying to identify whether the gap reflects genuine differences or exclusions. My bigger concerns are hidden structural work, electrical upgrades beyond basic checks, plumbing access, moisture damage, permit timing and long-lead materials—not finish selection.
For a property of this size, what contingency would you carry in Seoul? Also, which survey findings and contractor questions would most effectively reduce those unknowns before agreeing a contract? I’d particularly appreciate suggestions for comparing exclusions, sequencing assumptions and provisional allowances line by line.