One approach is to add a large contingency immediately; the other is to hold the budget down until the unknowns have been investigated. I am leaning toward the second, provided the checks are completed before the ZAR 3,560,000 allowance for this 145 m² Johannesburg detached home is treated as fixed.
The intended work includes the kitchen, bathrooms, floors, paint, electrical assessment and moderate energy improvements. I would like moisture readings, accessible plumbing inspected and the electrical quote divided between testing and remedial work. Contractors should also identify exclusions, access assumptions, approval timing and lead times for important materials.
There is no extension planned, but I do not want “no structural work” left as a loose phrase. Should the scope list every wall, opening and heavy built-in that will remain untouched, with a separate process and price basis if investigation reveals structural involvement? Once those points are clearer, how would you set the contingency for concealed conditions?
The intended work includes the kitchen, bathrooms, floors, paint, electrical assessment and moderate energy improvements. I would like moisture readings, accessible plumbing inspected and the electrical quote divided between testing and remedial work. Contractors should also identify exclusions, access assumptions, approval timing and lead times for important materials.
There is no extension planned, but I do not want “no structural work” left as a loose phrase. Should the scope list every wall, opening and heavy built-in that will remain untouched, with a separate process and price basis if investigation reveals structural involvement? Once those points are clearer, how would you set the contingency for concealed conditions?