The practical problem is setting a defensible price without enough completed sales to anchor it. This small multifamily in Santiago is listed at CLP 1,358,000,000, has been available for 108 days and requires updating. I am considering CLP 1,222,200,000 as the first offer, which is 10% lower.
Financing evidence and flexibility on completion may make that number easier for the seller to consider, but I do not want those strengths offset by excessive risk elsewhere. If the known updating is included in my offer, I would reserve repair credits for substantial inspection discoveries. If it is not included, I should probably revise the price before submitting rather than negotiate the same work twice.
How would you set the response period and keep the deposit protected through inspection, financing and appraisal conditions, particularly where Chilean wording needs local review?
Financing evidence and flexibility on completion may make that number easier for the seller to consider, but I do not want those strengths offset by excessive risk elsewhere. If the known updating is included in my offer, I would reserve repair credits for substantial inspection discoveries. If it is not included, I should probably revise the price before submitting rather than negotiate the same work twice.
How would you set the response period and keep the deposit protected through inspection, financing and appraisal conditions, particularly where Chilean wording needs local review?