Contingency and hidden risks for a 35 m² Kuala Lumpur condo renovation

GentleQuill

Homeowner
The MYR 269,200 budget makes the project sound well contained, but I hesitate to fix either the price or programme before the concealed services are checked. This is a 35 m² older condo in Kuala Lumpur, and the planned work includes the wet areas, kitchen, finishes and electrical scope rather than an extension.

My main concerns are moisture, access to pipework, the condition of wiring and what the contractor has left outside the price. I also need to understand whether building approval or permit timing could delay the sequence. What would you inspect first, which exclusions should be priced separately, and how much contingency would you retain until those points are resolved?
 
With that much uncertainty, I’d provisionally carry 15–20%, leaning toward the upper end until limited opening-up and moisture investigations are done. Ask whether the quote excludes hacking and disposal, waterproofing repairs, concealed pipe replacement, electrical upgrades beyond inspection, making good, permits and building-management requirements. I’d investigate wet areas and plumbing access first, then finalise electrical work before flooring or cabinetry. Also ask which materials have long lead times. Does the MYR 269,200 already contain provisional sums or any contingency?
 
Back
Top