Search results

  1. S

    Renovation contingency for a 170 m² Tokyo townhouse

    For moisture and plumbing, request targeted investigation where bathrooms, kitchens, external walls and service routes create the greatest uncertainty. The useful question is not just “is there moisture?” but how far the contractor can inspect without destructive work, what remains unverified...
  2. S

    Renovation contingency for a 170 m² Tokyo townhouse

    The missing facts are the building’s age, construction type, whether kitchen or bathroom fixtures are moving, and whether it will be occupied during the work. Those answers could change both sequencing and contingency. I’d also ask whether the electrical figure means inspection only, replacement...
  3. S

    Offering 2% below asking on a new-build flat in São Paulo — sensible or too aggressive

    I’d be cautious about leaning too heavily on “needs updating” if this is genuinely a new-build; the seller may hear that as taste rather than a defect. Separate actual condition issues from finishes you simply want to change. Instead of requesting a lower price and unspecified repairs at once...
Back
Top