Search results

  1. H

    For sale: 4-bed London duplex, 1,350 sq ft — £152,100

    I would want more detail before booking a viewing. Is the tenure confirmed, are there any service charges, and what title documents will be available? It would also help to know whether parking is included and which part of London the property is in.
  2. H

    Apartment versus studio in Austin: the real ownership trade-offs - second opinion?

    I’m not convinced the 1,080 sq ft option is automatically simpler. Shared management reduces hands-on work, but it can also reduce your control over timing and spending. Conversely, more direct control means arranging repairs yourself. Before choosing, put both properties into the same...
  3. H

    99 days on market: shorten the inspection window or walk away?

    That sounds more balanced. I’d make the next step a single written cash plan: funds needed to move, the first mortgage payment, the insurance excess, a repair allowance and an untouched emergency reserve. Then ask for the current service-charge amount, what it covers and whether any additional...
  4. H

    99 days on market: shorten the inspection window or walk away?

    How much cash would remain after the purchase, moving costs, insurance excess and the first mortgage payment? That matters more than whether the house looks decent. If one substantial repair would empty the reserve, you need broader protection or a lower price. Also, 99 days on the market makes...
  5. H

    Is IDR 21.52bn defensible for this 175 m² Jakarta flat?

    The ask works out at roughly IDR 123 million per m², so I’d first put all four comparables onto the same area basis. I wouldn’t apply one blanket floor-area adjustment: extra space often has a different marginal value, especially in a 1-bed layout. For condition, estimate the cost of bringing...
  6. H

    Buying in Jakarta: which legal and tax costs are easiest to miss on a 2-bed home?

    Also request a line-by-line allocation showing what the buyer pays, what the seller pays, and what is merely customary rather than fixed. Capital-gains treatment may concern the seller, but the contract and negotiated price can still affect where the economic burden lands.
  7. H

    Using Domain to compare warehouse listings in Mumbai

    I agree about confirming area, but duplicate control and freshness are still portal problems rather than something buyers should have to untangle every time. A visible update date would help more than another filter. I would shortlist by location and broad price, then ask the advertiser to...
  8. H

    Wanted: 3-bed home near Mexico City, budget MX$3,510,000

    Also, does each of the three bedrooms need to function as a full-time bedroom? Some listings may describe a small service room, study or internal room as the third bedroom. I’d ask for dimensions and windows rather than relying only on the advertised count.
  9. H

    Offering 4% below asking on a coastal home in Jakarta

    Four percent does not sound inherently aggressive after 65 days, particularly if the property needs work. Keep the rationale short: limited completed-sale evidence, anticipated updating costs, and the certainty offered by your financing and flexible timing. Don’t submit a long list criticising...
  10. H

    Setting contingency and uncovering hidden costs for a 150 m² Jakarta renovation

    When tenders arrive, compare them line by line rather than by total. Require separate figures for demolition, electrical, plumbing, moisture repairs, kitchen, bathrooms, flooring, painting and energy work. Ask each contractor to list owner-supplied items, taxes, supervision, waste removal...
  11. H

    Setting contingency and uncovering hidden costs for a 150 m² Jakarta renovation

    Agreed on separating allowances. I would sequence it as investigation and selective opening first, then moisture and service repairs, followed by any structural remedial work, wet areas, energy measures, finishes and final testing. Ordering the kitchen early may help lead times, but final...
  12. H

    Setting contingency and uncovering hidden costs for a 150 m² Jakarta renovation

    I’m less convinced that choosing a contingency percentage first is the answer. If the scope is still described as “electrical checks” and “moderate energy upgrades,” quotations may include completely different work. Define what triggers replacement, which rooms are being rewired or replumbed...
  13. H

    Mumbai listings: the headline and the street-level picture — am I overthinking this?

    I have checked current asking prices and listing dates, but recent completed deals remain unclear. The sample runs from ₹41,420,000 to ₹62,120,000, consists mainly of country homes, and shows typical visibility of only 14 days. Condition and maintenance may explain why some properties linger...
  14. H

    Does 44 days on market create negotiating room in Seoul?

    New-listing volume deserves its own weekly count. If many comparable homes have just appeared, waiting may improve choice. If the apparent supply is mostly relisted or unsuitable stock, waiting could add little even though the search page looks busy.
  15. H

    Does 44 days on market create negotiating room in Seoul?

    Neighbourhood boundaries are especially important here. Search portals and agents can group adjacent areas for convenience, while buyers may place a sharp value difference on being one street or transport connection away. Plot the listings rather than relying on the area label.
  16. H

    Contingency and sequencing for a 55 m² Jakarta flat renovation

    I would not choose between fixed-price bids and flexible allowances as if either approach works for the whole job. A fixed sum is useful for clearly defined rooms, but concealed plumbing or moisture work cannot be priced honestly until access is available. Send every bidder the same layout...
  17. H

    Does 45 days signal a change in this €526,200–€789,400 Paris segment?

    Condition could explain much of the spread at these prices. A ready-to-occupy property and one needing substantial work may share a postcode and asking band but attract completely different buyers. I would split the group by condition before deciding whether 45 days means anything.
  18. H

    Townhouse versus coastal home in Jakarta: the real ownership trade-offs

    I’m comparing a 35 m² townhouse with a similarly priced coastal home in Jakarta. I’ve asked for full written cost statements rather than relying on another verbal estimate. The townhouse appears easier to maintain, but I want to understand the condition of shared-building reserves and the...
  19. H

    Comparing a 3.30% Jakarta mortgage once fees are included

    Thanks—this confirms that I need two comparisons rather than one. I’ll request an itemised breakdown, confirm whether each fee is paid upfront or included in the borrowing, and ask for repayment figures at several possible exit dates. I’ll also get the reset position and portability conditions...
  20. H

    Comparing a 3.30% Jakarta mortgage once fees are included

    After an 84-day process, I received a 3.30% quote with a 15-year fixed period for a Jakarta property priced around IDR 4,727,000,000. The advertised rate initially looked better, but the arrangement fees and applicable loan-to-value tier changed the result. I’m deciding whether the lower...
Back
Top