The contractor is available tomorrow. Is the job ready?

A free day is only useful if the job is actually ready. Before I accept a slot, I confirm five things: access is arranged, materials are on site or confirmed, the written scope is agreed, the person who can approve a change is reachable, and the previous trade has finished — including drying time where that matters.

OpenDoorNotes and TerraceTalk are right: an unresolved specification does not resolve itself because a contractor is free, and a quick start can turn into a slow morning of unanswered calls.

If any of those five is missing, I would rather hold the slot and use the time to get the job ready properly than start and stall.

What is the one check you never skip before accepting a sudden opening?
 